A leading Oil & Gas operator commissioned TECSA to carry out the risk analysis for extraordinary maintenance work on the tanker beam of an FSO (Floating Storage and Offloading) unit permanently moored in an offshore oil field, as required by the Directorial Decree of 15/07/2015 and the Ministerial Circular of 09/05/2018. The work restores the structural integrity of the box girder connecting the unit to the mooring yoke by repairing three cracks found in the welds of the internal stiffeners (approximately 150, 120 and 90 mm long). The repairs involve hot work in a confined space while the facility remains in production, without purging the process lines. The goal of the assignment was to identify the most severe credible incident and estimate the cost of its damage, in support of the financial guarantees required for the mining permitting process.

The analysis covered the full workflow. It began with a document review, covering the qualified repair procedure agreed with the Classification Society, the structural drawings, the emergency plan and the coordinated safety and health document. It then characterised the four main operational phases: creating access openings and manholes, setting up the ventilation and rescue system, carrying out the welding with NDT inspections, and demobilising the worksite. For each phase, the analysis identified all reasonably foreseeable risks to people, the environment and property, as required by Annex 1 of the Directorial Decree of 15/07/2015. This produced 17 incident scenarios in total, with none excluded on the basis of frequency.

Case studies

All case studies