Context
An upper-tier chemical-pharmaceutical establishment, subject to Italian Legislative Decree 105/2015 (Seveso III), commissioned TECSA to design the new fixed active fire protection systems for its new flammable liquids warehouse. The precast reinforced concrete building is divided into three fire compartments of about 106 m² each, with racks more than nine metres high holding drums and IBCs of flammable liquids, polar solvents included. Two scenarios had to be controlled: a pool covering the whole storage area and a fire climbing the racks.
Approach
Sizing follows UNI EN 13565-2: every correction factor is justified and leads to a design density of 14.4 l/min·m², with a 30-minute design discharge duration. The result is a 3% AFFF-AR water-foam deluge system with two networks per compartment: 45 medium-expansion ceiling nozzles for the pool and 32 low-expansion nozzles on two in-rack levels for the fuel shielded by the shelves.
The network of each compartment layout was verified nozzle by nozzle with Sunrise Pipenet (Vision + Spray/Sprinkler). The design is managed digitally from the hydraulic model to the line isometric sketches, with bills of materials and cut lists, down to the support typicals assigned bay by bay. The fire & gas system, to UNI 9795 and EN 54, combines UV/IR flame detectors with 2oo2 confirmation before discharge, floor-level IR flammable gas sensors with dedicated panels interfaced with the loop, and EN 12094-1 certified extinguishing channels.
Results
At the supply pressure the network delivers about 4,070 l/min per compartment, with at least 3.3 bar at the most remote nozzle: the ceiling network alone already meets the code minimum. The Client received a 21-annex package, shared phase by phase and ready for detailed engineering and the request for quotation: 36 isometric drawings, 15 support typicals, 11 component data sheets, P&ID, fire & gas schematics, calculation reports and a cost estimate.
Why TECSA
A single team for suppression, detection and activation logic, with criteria traced down to the individual nozzle and a full hydraulic verification rather than an estimate: protection of a Seveso store demonstrated with numbers and delivered in a form the Client can take straight to tender.